The DeWitt mall team has been in the news lately following their first public meeting.  Findings from last semester’s DesignConnect team were presented and feedback was gathered from the public.  The information presented has captured the attention of local news outlets and many residents have expressed their anticipation for DesignConnect’s final deliverables.  The final deliverables the team is working on include renderings of a new interior and exterior for ShoppingTown, elevations and final plans for the redevelopment.  These final deliverables will be presented at a second public meeting in the near future.  For links to news stories about the DeWitt ShoppingTown project, head over to our recent post about DesignConnect’s presence in the news. You can take a look at the team’s project proposal by clicking the link below.

Dewitt proposal Spring 2012